Products
Joodra OS is designed as an Ontology from the lowest level of the industrial domain up.
01Joodra Monitoring System
Joodra Monitoring System
Collects data from site equipment to observe condition and performance, detect anomalies, and respond with control.
Collects the state of UPS battery equipment in real time.
Customer cases
Client K, South Korea
UPS batteries
62+ stations8 months incident-free in commercial operation14,009 faults detected
| Area | Before | After |
|---|---|---|
| Observation scope | A separate screen per station | 62+ stations on one standard |
| Alarm standard | Different for every vendor | One threshold rule |
| Anomaly location | Site level | Cell · module level |
| Response | Nothing to be done once found | Charge/discharge schedules and power commands |
| SOC · SOH | A different value on every vendor screen | Normalized into one schema |
| SOH prediction | Assumes a single pack | Corrected for mixed-cell conditions |
| 8 months of operation | Could not be caught in advance | 14,009 faults detected, zero incidents |
Where it applies
Rail · transit infrastructure UPS
Mobile assets (drones · robots)
ESS · power generation
Data center backup power
Battery manufacturing · reuse
02Joodra Works
Joodra Works
Tracks and analyzes site workflows in real time to deliver an automated operating environment.
Traces the flow of cost from inbound to sale.
Customer cases
Client P, United States
ITAD · Recycling
3 sites200+ active usersDeployment completed April 2025
| Area | Before | After |
|---|---|---|
| LOT traceability | Scattered across memory and ledgers | One history from intake to outbound |
| Work records | No record of who handled it | Operator recorded at every process |
| Audit response | History reassembled from spreadsheets | A query against LOT history |
| chain-of-custody documents | Written by hand | Generated from LOT history |
| Mass Balance | Reconciled by hand | A result of computation |
| Cost · accounting reconciliation | Retyped between systems | Attached to the same history |
| Operational overhead | Baseline | Down 30% |
| Time to real use | 6–12 months on a general-purpose ERP | 3 months |
Where it applies
ITAD · e-waste recycling
Metals · materials recycling
End-of-life battery recycling
Manufacturing (machining · assembly)
Logistics · warehouse operations