Joodra

Products

Joodra OS is designed as an Ontology from the lowest level of the industrial domain up.

Joodra Monitoring System

Collects data from site equipment to observe condition and performance, detect anomalies, and respond with control.

Collects the state of UPS battery equipment in real time.

-500-400-300-200-1000100200
17:0017:3018:0018:3019:0019:3020:0020:3021:00

Customer cases

Client K, South Korea

UPS batteries

62+ stations8 months incident-free in commercial operation14,009 faults detected

AreaBeforeAfter
Observation scopeA separate screen per station62+ stations on one standard
Alarm standardDifferent for every vendorOne threshold rule
Anomaly locationSite levelCell · module level
ResponseNothing to be done once foundCharge/discharge schedules and power commands
SOC · SOHA different value on every vendor screenNormalized into one schema
SOH predictionAssumes a single packCorrected for mixed-cell conditions
8 months of operationCould not be caught in advance14,009 faults detected, zero incidents

Where it applies

  • Rail · transit infrastructure UPS

  • Mobile assets (drones · robots)

  • ESS · power generation

  • Data center backup power

  • Battery manufacturing · reuse

Joodra Works

Tracks and analyzes site workflows in real time to deliver an automated operating environment.

Traces the flow of cost from inbound to sale.

Customer cases

Client P, United States

ITAD · Recycling

3 sites200+ active usersDeployment completed April 2025

AreaBeforeAfter
LOT traceabilityScattered across memory and ledgersOne history from intake to outbound
Work recordsNo record of who handled itOperator recorded at every process
Audit responseHistory reassembled from spreadsheetsA query against LOT history
chain-of-custody documentsWritten by handGenerated from LOT history
Mass BalanceReconciled by handA result of computation
Cost · accounting reconciliationRetyped between systemsAttached to the same history
Operational overheadBaselineDown 30%
Time to real use6–12 months on a general-purpose ERP3 months

Where it applies

  • ITAD · e-waste recycling

  • Metals · materials recycling

  • End-of-life battery recycling

  • Manufacturing (machining · assembly)

  • Logistics · warehouse operations